Tool implementation

1.Weigh Batch Machine RM 800 - 2 Nos
2.Full load cement mixer machine - 4 Nos
3.Half load mixer machine - 12 Nos
4.Needle vibrator / Electrical & Petrol - 23 Nos
5.Electrical Sieving Machine - 4 Nos
6.Breaking/Drilling/Cutting & machine - 23 Nos
7.Compressor - 2 Nos
8.Earth Rammer - 4 Nos
9.Blower - 2 Nos
10.Compressor and Motors - 15 Nos
11.Oil Engine 10Hp - 1 No
12.JCB - 1 No
13.Earth Rammer - 1 No
1.Vacuum Dewatering Pump - 1 No
2.Power Travels - 3 Nos
3.Ride on Travels - 1 No
4.Floor Grinding Machine - 1 No
1.Builders Hoist - 3 Nos
2.Tripod Lift - 7 Nos
1.Container 20'X8'X6' - 8 Nos
1.Centering
* Water Proofing Ply & Silver Wood Runners etc., * Floor Form (Size 3'X 2',4'X 2', 3'X 1'6", 3'X 1', 3'X 9")
2.Centering and shuttering
* material for a project of about (60,000 sq ft)
1. Total Station ( Leica Instrument) - 1 No
2. Levelling instrument, Dumpy level - 2 Nos
3. Theodolite - 1 No
4. Compass - 2 Nos
1. Welding Machine & Cable
2. Grinding Machine
3. Cutting Machine
4. Drilling Machine
5. Gas Cutting Torch with Regulator
6. Tools Set
7. Generator 15 KV
1. Planning Machine
2. Cutting Machine
3. Carving Machine
4. Cutting Blade Sharpening machine
1. Mahindra Maxi. Truck - 2 Nos
2. Tractor with Trailer - 1 No
3. Water tanker Trailer - 4 Nos
1. Safety Net
2. Barrier Caution Taps
3. Air protection Mask
4. Gloves
5. Reflective vest
6. Respiratory Protection
7. Hard Hats
8. Fire Kits
9. Reflective Cones
10. Safety Belt